
If your plant is generating less than it used to, or you are about to buy a property with solar already on the roof, we inspect it end to end. Earthing, cabling, protection and switchgear are checked, the strings and the inverter are tested, and you get a written report with the faults ranked by urgency.
Survey to commissioning in 7 to 12 working days for a typical rooftop.
25 years on modules, 5 to 10 on the inverter, 5 years workmanship.
12 months free maintenance, then an AMC with two preventive visits a year.
Tell us your monthly bill - we size the plant, file the subsidy and handle net metering.